NIACC Building Trades / Carpentry
MODULE TITLE - 3D Ceiling Framing
|
PREPARATION |
|
|
Prerequisites |
3A Wall Framing, 3B Wall Layout and Plating Detailing, 3C Floor Framing; Basic measuring skills and blueprint reading |
|
Safety |
Personal protective equipment, power hand tool procedures |
|
Objectives |
Layout, cut, and install ceiling joists. Cut taper on ends for all rafters. Assemble, erect, brace, and straighten bearing partitions. Identify various manufactured ceiling framing products. Explain how ceiling systems provide structural stability. |
|
CURRICULUM |
|
|
Teaching aids |
floor space, floor framing materials, student hand outs |
|
Instruction |
text w/ lecture and demonstration |
|
Math Skills |
materials estimate for o.c. foundation, joisting, and sheathing layout, manipulate fractions and mixed numerals, 3-4-5 method |
|
Safety |
Personal protective equipment, power hand tool procedures |
|
Tools |
hammer, tape measure, pencil, speed square, framing square, level, handsaw, portable circular saw, chalk line, dry line |
|
Materials |
posts, girders, joist material, subflooring, fasteners, hardware |
|
Processes |
3-4-5 method, set girders, posts, and cap or top plate, o.c. ceiling components layout, |
|
Additional References |
Manufacturer’s installation instructions |
|
LAB ACTIVITIES |
|
|
Materials |
posts, girders, joist material, subflooring, fasteners, hardware |
|
Tools |
hammer, tape measure, pencil, speed square, framing square, level, handsaw, portable circular saw, chalk line, dry line |
|
Procedures |
per project |
|
Directions |
|
|
EVALUATION |
|
|
Project(s) |
as assigned by instructor |
|
Homework/Study |
related chapter in textbook |
|
Assessments |
proper completion of projects and assignments |
« Back to Curriculum Resources